Use the Template Before Asking Only for Price

A price request without an application, profile, color reference, performance scope, and packing basis forces suppliers to make assumptions. Use one RFQ revision so every supplier answers the same fields.

Required RFQ Sections

The workbook separates buyer input, supplier response, sample approval, and batch packing records.

RFQ sectionCore fields
Furniture programProduct type, furniture part, target market, exposure, and project photos
ProfileFamily, width, thickness, diameter, wall structure, surface, and flexibility
ColorName, physical reference, mixed or gradient requirement, and master sample
PerformanceUV requirement, requested evidence, and destination-market requirements
SampleLength or quantity, test-weave plan, approval deadline, and shipping
Commercial volumeTrial order, monthly estimate, annual estimate, and MOQ discussion
Roll and packingMeasured g/m if known, roll weight or length, core, labels, cartons, and pallets
LogisticsDestination, requested Incoterm, target shipment, and mixed loading
ApprovalRFQ revision, approved sample code, approver, and production release

Attachments That Improve the Quotation

Attach furniture and frame photos, dimensioned drawings, an old strip or approved sample, a physical color reference, test or market requirements, and the expected packing flow. Remove confidential customer branding when it is not needed.

How to Compare Supplier Responses

Compare confirmations and proposed alternatives line by line. Separate technical acceptance from commercial terms, and require the supplier to identify exclusions, evidence scope, price basis, MOQ, sample lead time, bulk lead time, and packing assumptions.

Commercial Terms That Must Be Confirmed in the Quotation

PE rattan MOQ, custom-color minimum quantity, lead time, warranty scope, packing and delivery terms should be confirmed for the specific product, color, formulation, order quantity and production schedule. A general website reference should not be treated as a binding commercial term unless it is repeated in the current quotation or contract.

Commercial ItemWebsite ReferenceBuyer Must ConfirmBinding Record
MOQPlanning/reference only; no universal product minimum is bindingCurrent minimum for the selected profile, color, formulation, packing, and order stageCurrent quotation and accepted order specification
Custom-color minimumPlanning/reference only; depends on the selected formulation and profileMinimum quantity for the selected formulation, profile, color, and recipeCurrent quotation, color approval, and order record
Sample costConfirm availability and cost for the requested sampleWhether sample material is chargeable and under what conditionsQuotation or written sample confirmation
Sample freightConfirm freight responsibility and destinationCarrier, destination, freight payer, and any import chargesQuotation, freight document, or written confirmation
Sample timingConfirm current preparation and shipping scheduleDispatch point, timing assumptions, and dependenciesQuotation or sample schedule
Production lead timeConfirm current production schedule; do not rely on a general estimateClock start, order specification, capacity constraints, and dependenciesCurrent quotation and accepted production schedule
PackingConfirm packing method and protection for the orderRoll/bag basis, labels, net/gross basis, cartons, pallets, and loadingQuotation, packing specification, and approved order
IncotermNo universal Incoterm is statedNamed Incoterm, named place, risk transfer, documents, and exclusionsQuotation and contract
Payment termNo universal payment term is statedCurrency, deposit, balance, payment trigger, and bank detailsQuotation and contract
Quotation validityNo universal validity period is statedExpiry date, price basis, exchange or material assumptions, and revisionSigned or accepted quotation
WarrantyConfirm project-specific scope and durationDuration, covered product/scope, exclusions, evidence, and claim processQuotation, contract, and approved specification
Claim/exclusion scopeMarketing wording is not a binding claimIncluded performance, limits, exclusions, evidence, and remedyQuotation, contract, and claim record

Worked Example: Comparing Two PE Rattan Quotations

Illustrative example โ€” not a Greenlife customer order and not actual supplier data. This hypothetical outdoor dining-chair-back program shows how a buyer can turn incomplete responses from Supplier A and Supplier B into a documented follow-up question.

Comparison FieldSupplier ASupplier BBuyer Follow-Up Question
ProfileNames a flat profile but does not attach a cross-sectionNames a flat profile and references a drawing revisionWhich measured dimensions and approved sample identify the offered profile?
Color referenceUses a color name onlyRequests a physical color referenceWhat physical reference and viewing/approval record will control the color?
UV evidence scopeStates an outdoor claim without method or sample scopeAsks which method and sample scope are requiredWhich method, sample, profile, color, and limitation should the evidence cover?
Measured g/mNot statedWill measure after profile confirmationCan each supplier state the measurement method and the basis used for the quote?
Net/gross roll basisQuotes roll weight without identifying net or grossSeparates net material and packing basisIs the quoted roll basis net material, gross packed roll, usable length, or another defined basis?
Sample methodOffers a loose stripOffers a strip and asks for a frame trialWill the sample reproduce the intended profile, color, frame, and fixing method?
Test weavingNot addressedRequests a representative dining-chair-back testWho supplies the frame or jig, pattern, fixing method, timing, and acceptance record?
PackingStates standard packing onlyRequests the required labels and protectionWhat roll protection, labels, carton/pallet basis, and loading conditions are required?
MOQStates a commercial minimum without conditionsAsks whether MOQ changes by profile or colorWhat is the MOQ basis for this profile, color, packing, and order stage?
Lead timeStates a single lead-time estimateSeparates sample and bulk timingWhat starts the clock, and what dependencies or exclusions apply?
IncotermUses an Incoterm without a named placeAsks for a named place and scopeWhich named place, handling scope, documents, and delivery responsibility apply?
Approval recordNot addressedRequests RFQ revision and sample sign-offWhich revision, sample code, approver, and release record will govern the bulk order?

The example does not supply a pass/fail result or a material specification. It teaches the buyer to keep assumptions visible until the profile, color, evidence scope, sample, packing, and approval record are complete.

Version and Approval Control

Use a stable convention such as Buyer-Program-RFQ-001-Rev01. Do not mix fields from different revisions. Record the approved sample code, approver, approval date, and production release against the final RFQ.

Current Evidence Status

The downloadable Excel template, PDF preview, and illustrative quotation comparison are published. The comparison is not customer data, actual supplier data, or Greenlife product data; a completed customer RFQ is not published.

Buyer FAQ

What information should a PE rattan RFQ include?

Include the furniture application, profile and dimensions, surface, physical color reference, UV evidence requirement, sample plan, volume, roll standard, labels, packing, destination, and approval record.

Should PE rattan be quoted by kilogram or meter?

Ask the supplier to state the price basis and measured grams per meter. Different profiles can produce different lengths at the same weight.

What attachments improve a quotation?

Furniture photos, frame drawings, an old material sample, a physical color reference, installation details, and any destination-market requirements reduce assumptions.

How should buyers compare supplier responses?

Compare the confirmed specification, proposed alternatives, MOQ, lead time, evidence, exclusions, sample method, packing, and Incoterm on the same RFQ revision.

Does this template replace sample approval?

No. It organizes the request and response, but final approval still requires physical samples and test weaving on the intended frame.

Is website MOQ always the final MOQ?

No. Treat any website figure as a planning reference unless the current quotation or contract repeats the applicable minimum for the selected profile, color, formulation, packing, and order.

Does Greenlife offer a fixed warranty on every PE rattan product?

This page does not establish a fixed warranty. Ask the supplier to state the project-specific duration, scope, exclusions, evidence, and claim process in the quotation or contract.

Is lead time the same for every profile/color?

Do not assume that. Confirm the current production schedule, order specification, color or formulation, quantity, packing, and dependencies for the requested item.

Are samples always free?

Do not assume that. Confirm sample availability, cost, freight, and timing for the requested sample in the quotation.

Which commercial terms should appear on the quotation?

The quotation should identify the applicable MOQ, custom-color minimum, sample charges and freight, sample timing, production lead time, packing, Incoterm, payment term, quotation validity, warranty scope, and claim or exclusion scope.

Related Guides

Indonesia Supplier Guide Incoming QC UV Guide Profile Matrix Color Approval Roll Calculator Furniture Usage Estimator

Privacy and Review

Remove customer names, unreleased designs, pricing, and confidential branding before sharing files unless the receiving supplier is authorized. Retain enough technical detail to identify the application. Author and reviewer: Greenlife Rattan buyer-support team. Published and last reviewed: 2026-08-10.

Send a Completed RFQ

Attach the completed workbook and any approved reference files when requesting a sample or quotation.

Contact Greenlife